Project Details
Location
Value in SR
Client
Period
Type
Consultant

Project Description

Scope of work 

The scope of work of this EPC Project includes Engineering, Supply, Installation and Testing & Commissioning of 33 KV Substation as follows:

  • 4 X 33 KV Double Bus Bar Feeder Bays
  • Replacement of 2 X 20 MVA, 33/13 KV Transformer with 2 X 40 MV Transformer
  • 2 Shunt Capacitor Bays of 13.8 KV, 2 X 3 MVAR Capacitor Banks
  • SCADA & Telecommunication System
  • Protection & Control System
  • Civil Work/Buildings
  • GIS/Switchgear 
    • Building} 1,000 m2
    • Medium Voltage/Control Building}

 

Dhuba & Jouba Saudi Arabia
22 Millions
SEC-WOA
25/08/04 To 25/06/06
POWER GENERATION & TRANSMISSION
Saudi Consult