Project Description


Scope of Work

The scope of this EPC project includes the following:

  • Supply & installation two 30/40 (MVA) 115/13.8kV transformers, one circuit switcher, three current transformers, three voltage transformers.
  • Supply & install one 13.8kV switchgear line-up five C.B at Tufaih, one 13.8kV switchgear line-up sixteen C.B at Jubail, one 13.8kV switchgear line-up six C.B and associated equipment and civil works.
  • Install SCECO East supplied 2 x 16.8/22.4 MVA transformer.
  • Supply & install protection & control system
  • Civil/Building
  • GIS/Switchgear Building} 1,000 m2
  • Medium Voltage/Control Building}
Jubail and Qaisuma Eastern Province Saudi Arabia
26 Millions
SEC - ERB
Jan. 2000 To June 2002
POWER GENERATION & TRANSMISSION
By the Client