Project Details
Location
Value in SR
Client
Period
Type
Consultant

Project Description


Scope of Work

The scope of work of this Lump sum Turnkey Project includes Engineering, Supply, Installation and Testing & Commissioning of 115 KV Substation

  • 15 KV GIS
  • 3 x 40 MVA Power Transformers
  • 32 Breakers 13.8 KV MV Switchgear
  • Protection & Control System
  • Communication System
  • SCADA System
  • Electromechanical Works
  • 5.5 KM Double Circuit Overhead Transmission Line
  • Civil Work/Buildings
  • GIS/Switchgear
    • Building} 1,000 m2
    • Medium Voltage/Control Building}
Al-Khobar Saudi Arabia
31 Millions
SEC-ERB
30/12/02 to 31/08/07
POWER GENERATION & TRANSMISSION
By Client